Engineering
Location
Hours
Staff
Thomas Timko, P.E.,C.M.E
Township Engineer
908-204-3020
Katelyn Dmitruck, P.E.
Assistant Township Engineer
908-204-3007
David Quarcoo
Senior Staff Engineer
908-204-3005
Daniel Herron
Staff Engineer
908-204-3008
Steven Anello
Civil Engineering Technician
908-204-3006
Susan Long
Administrative Coordinator
908-204-3020
Donna Gooley
Administrative Assistant
908-204-3000
Ellen Houlihan
Administrative Associate
908-204-3019
Fax: 908-204-3089
Engineering Information
The Engineering Services Department oversees the Engineering, Planning, Zoning, Fire Prevention Bureau and Construction Code Departments. This department also administers the Planning Board and Board of Adjustment. Close coordination is also maintained with the Agricultural Task Force, Environmental Commission, Shade Tree Commission, and other Township Departments.
The Engineering Department administers all land use and construction work in the Township. The land use reviews range from an individual resident's zoning concern to the review of large-scale residential and commercial projects. The site inspection staff reviews all development and Township construction. The Engineering staff provides in-house designs for road maintenance, drainage, and bikeway/sidewalk programs. Township tax and GIS data maps are also maintained by Engineering Department personnel.
The Department completed the engineering design and construction project management for the reconstruction and resurfacing of approximately 5 miles of Township roadway.
· 2024 Roads Paving
o Dyckman Pl
o Forbes Ct
o Ashwood Ln
o Linden Dr
o Summit Dr
o Hillcrest Way
o Beechwood Rd
o Oakley St
o Voorhees Dr
o North Voorhees Dr
o Old Coach Rd
o Carriage Way
o Tuxford Tr
o Essex Pl
o Smithfield Ct
o Plymouth Ct
o Darren Dr
· Somerville Road Path – a path was constructed from the existing path near Stone Ridge Lane to the intersection of Mountain Road, approximately ¾ of mile in length.
· Lyons Road Path – various sections replaced comprising approximately 1.25 miles.
· East Craig Street path was replaced.
On all projects listed above:
· Sidewalks were repaired and ADA compliant curb ramps were constructed.
· Stormwater infrastructure was repaired, and new stormwater facilities were installed.
· Curbing repairs were completed.
· Traffic control devices were replaced.