NOTICE!
BID RESULTS. Preliminary bid results
will be posted
on our township web site; www.bernards.org
generally within 24-36 hours after date and time of bid opening.
BID #2013-05
ROAD IMPROVEMENTS
WEDNESDAY, APRIL 24, 2013 AT 10:30 AM
|
BIDDER NAME |
TOTAL BID AMOUNT |
MARK PAVING CO, INC
WOODBRIDGE, NJ |
$943,822.94 |
AJM CONTRACTORS, INC
CLIFTON, NJ |
$1,027,912.60 |
REIVAX CONTRACTING
NEWARK, NJ |
$1,051,454.80 |
TOP LINE CONSTRUCTION
SOMERVILLE, NJ |
$1,105,653.12 |
Z BROTHERS
SAYREVILLE, NJ |
$1,101,283.93 |
TILCON
WHARTON NJ
|
$1,161,557.00 |
BLACK ROCK ENTERPRISE
OLD BRIDGE, NJ |
$1,178,582.60 |
CROSS ROADS
NUTLEY, NJ |
$1,219,515.00 |
SCHIFANO CONSTRUCTION
MIDDLESEX, NJ |
$1,234,290.00 |
RENDA ROADS
WHITEHOUSE, NJ |
$1,357,430.10 |
VENDOR
|
Andy Matt, Inc.
Wharton |
Rich Tree Service, Inc.
S. Plainfield |
High Tech Landscapes, Inc. Branchburg |
Tuff Greens
Rockaway |
Sunshine Tree & Landscape
Stewartsville
|
HOURLY RATE
|
169
|
200
|
180
|
220
|
237.50
|
HALF DAY RATE |
749
|
800
|
810
|
1200
|
950
|
DAILY RATE |
1352
|
1600
|
1440
|
1750
|
1900
|
HOURLY EMERGENCY RATE |
199
|
300
|
240
|
285
|
265
|
HALF DAY EMERGENCY RATE
|
869
|
1000
|
1080
|
900
|
1060
|
DAILY EMERGENCY RATE
|
1592
|
2000
|
1920
|
2200
|
2120
|
|
|
|
|
|
|
|
100 FOOT CRANE (10 TON MINIMUM) WITH OPERATOR
|
HOURLY RATE |
120 |
400 |
192 |
300 |
140 |
|
HALF DAY RATE |
550 |
700 |
864 |
1089 |
520 |
|
DAILY RATE |
960 |
1100 |
1536 |
1303 |
1040 |
|
HOURLY EMERGENCY RATE |
160 |
600 |
230 |
350 |
150 |
|
HALF DAY EMERGENCY RATE |
680 |
1200 |
1035 |
1089 |
600 |
|
DAILY EMERGENCY RATE |
1420 |
2000 |
1840 |
1303 |
1200 |
STUMP GRINDING SERVICES
|
GRINDING OF STUMP (PER DIAMETER INCH) |
4.89 |
4.00 |
6 |
10 |
4.00 |
DISPOSAL COSTS
|
DISPOSAL OF WOOD (ON A NEEDED BASIS, PER CUBIC YARD |
35 |
9 |
20 |
30 |
3 |
|
DISPOSAL OF WOOD CHIPS (ON A NEEDED BASIS, PER CUBIC YARD |
25 |
4 |
16 |
15 |
0 |
OPTION A
(WITH TRADE-IN)
|
VENDOR |
|
Foley Piscatawey |
|
|
|
VEHICLE
TYPE |
UNIT
COST |
TOTAL
COST |
UNIT
COST |
TOTAL
COST |
|
|
110,913.80 |
110,913.80 |
$ |
$ |
|
ONE (1)
CATERPILLAR 420F IT BACKHOE LOADER (OR EQUIVALENT) |
||||
|
|
||||
|
LESS TRADE-IN |
10,000.00 |
10,000.00 |
|
|
|
|
||||
|
#703 – 1996 Caterpillar 426B |
||||
|
VIN #6KL02334 |
||||
|
HOURS: 5,509 |
||||
|
Net Delivered Lump Sum Bid |
100,913.80 |
$100,913.80 |
|
$ |
#2013-02
PLEASANT VALLEY POOL-
TRAINING POOL REPLASTERING
BIDS RECEIVED WEDNESDAY, FEBRUARY 13, 2013
|
BIDDER NAME |
BASE BID |
|
Ray
Palmer Association |
$
58,400.00 |
|
Stoneridge
Aquatic |
$67,400.00 |
2013-01 GOLF COURSE
MAINTENANCE
BIDS RECEIVED WEDNESDAY, JANUARY 16, 2013 AT 10:30 AM
|
BIDDER NAME |
TOTAL 2013 |
TOTAL 2014 |
TOTAL 2015 |
OPTION #1 |
Shearon Golf/Environ.
Plymouth
Meeting, PA |
$187,200.00 |
$187,200.00 |
$187,200.00 |
$11.50/LF |
|
Turco Golf, Suffern, NY |
$ 399,000.00 |
$ 418,950.00 |
$ 439,897.50 |
$ 15.00 |
Bid # 2012-17
Janitorial Services
Totals do not reflect include cost adjustments:
|
Contractor |
Best Cleaning Service |
Excellent Building Services |
First Community Development |
|
PUBLIC BUILDINGS |
|
|
|
|
MUNICIPAL BUILDING |
$5,100.00 |
$10,200.00 |
$15,892.00 |
|
PUBLIC WORKS BUILDING |
$9,000.00 |
$8,040.00 |
$8,883.00 |
|
HEALTH DEPARTMENT |
$3,500.00 |
$4,920.00 |
$2,479.95 |
|
COMMUNITY CENTER |
$3,500.00 |
$5,040.00 |
$2,963.25 |
|
POLICE DEPARTMENT |
$5,700.00 |
$11,580.00 |
$8,505.00 |
|
Total 2013 |
$26,800.00 |
$39,780.00 |
$38,723.20 |
|
TOWNSHIP PARKS |
|
|
|
|
PLEASANT VALLEY PARK |
$2,100.00 |
$2,064.00 |
$1,431.00 |
|
SOUTHARD PARK |
$2,100.00 |
$2,064.00 |
$162.00 |
|
DUNHAM PARK |
$2,100.00 |
$2,064.00 |
$1,782.00 |
|
MT. ROAD PARK |
$2,100.00 |
$2,064.00 |
$2,997.00 |
|
ALTERNATE BID ITEM |
$960.00 |
$4,431.00 |
$2,565.00 |
|
Total 2013 |
$8,400.00 |
$8,256.00 |
$6,372.00 |
|
LIBRARY |
$10,400.00 |
$12,540.00 |
$33,750.00 |
|
GRAND TOTALS |
$51,972.00 |
$ 60,576.00 |
$ 78,845.00 |
#2012-15
2012 STORM INLET
REPAIRS
BIDS RECEIVED WEDNESDAY, OCTOBER 9, 2012 AT 10:30 AM
|
BIDDER NAME |
TOTAL BASE BID |
|
DM FERNANDES, LLC. |
$34,590.00 |
|
OCEAN CONSTRUCTION |
$67,250.00 |
|
C.R.C. CONTRACTING, INC. |
$69,542.00 |
|
M. SKY CONSTRUCTION |
$70,300.00 |
|
KDP DEVELOPERS, INC. |
$78,010.00 |
|
AL NETO CONTRACTORS |
$82,470.00 |
|
ROCK SOLID CONSTRUCTION |
$83,400.00 |
|
JOHN GARCIA CONSTRUCTION |
$84,450.00 |
|
HILLCREST PAVING & EXCAVATING, INC. |
$117,170.00 |
|
TILLERMAN LANDSCAPING, INC. |
$129,460.00 |
|
V & K CONSTRUCTION |
$140,060.00 |
#2012-16
2012 SIDEWALK
IMPROVEMENTS
BIDS RECEIVED WEDNESDAY, OCTOBER 9, 2012 AT 10:45 AM
|
BIDDER NAME |
TOTAL BASE BID |
|
DM FERNANDES, LLC. |
$110,030.00 |
|
YOUR WAY CONSTRUCTION |
$126,960.00 |
|
DIAMOND CONSTRUCTION |
$128,450.00 |
|
A.TAKTON CONCRETE CORP. |
$128,750.00 |
|
M. SKY CONSTRUCTION |
$134,300.00 |
|
OCEAN CONSTRUCTION |
$134,830.00 |
|
HELIOS CONSTRUCTION |
$141,520.00 |
|
COVINO & SONS CONSTRUCTION CO. |
$154,285.00 |
|
V & K CONSTRUCTION |
$161,690.00 |
|
C.R.C. CONTRACTING, INC. |
$161, 890.00 |
|
F & P CONTRACTORS |
$164, 460.00 |
|
BRENNAN BROS. |
$167,482.00 |
|
AL NETO CONTRACTORS |
$188,060.00 |
|
A & A CURBING, INC. |
$277,800.00 |
BTSA BID #2012-06
CLIMBER SCREEN REPLACEMENT
BIDS RECEIVED
WEDNESDAY, AUGUST 29, 2012 AT 10:30 AM
|
BIDDER NAME |
TOTAL BID AMOUNT |
|
COPPOLA
SVCS |
$379,489.00 |
|
EDC |
$388,867.00 |
|
SPECTRASERV |
$466,625.00 |
|
JOGI
CONST. |
$488,120.00 |
#2012-01 RE-BID
DUNHAM PARK HOCKEY
RINK RECONSTRUCTION
BIDS RECEIVED WEDNESDAY, AUGUST 29, 2012 AT 11:00 AM
|
BIDDER NAME |
BASE BID |
ALTERNATE |
|
HALECON, INC. |
$105,660.00 |
$16,000.00 |
|
TILLERMAN LANDSCAPING |
$147,970.00 |
$10,880.00 |
SNOW PLOWING, REMOVAL
& EQUIPMENT RENTAL
BIDS RECEIVED TUESDAY, AUGUST 21, 2012 AT 10:30 AM
|
BIDDER NAME |
BASE HOURLY RATE CLASS A |
BASE HOURLY RATE CLASS B |
BASE HOURLY RATE CLASS C |
Central Jersey Const
|
$
169.08 |
$155.58 |
$
122.13 |
Mountain Landscape
|
$ 175.00 |
$ 167.00 |
$ 148.00 |
Andy Matt
|
$ 195.00 |
$ 159.00 |
$ 119.00 |
BID #2102-14 2013
INTERNATIONAL MODEL 76000 6X4 CHASSIS
WITH A DUMP BODY,
SPREADER & SNOW PLOW OR EQUAL
BIDS RECEIVED TUESDAY, AUGUST 21, 2012 AT 10:45 AM
|
BIDDER NAME |
UNIT COST |
Brown
Hunterdon
|
$
195,593.00 |
Deluxe
International
|
$ 199,040.00 |
TOWNSHIP OF BERNARDS
|
Bidder |
|
2012-2013 Cost Per Month |
2013-2014 Cost Per Month |
2014-2015 Cost Per Month |
|
|
WASTE MANAGEMENT |
|
$21,719.00/yr |
$22,159.00/yr |
$22,599.00/yr |
|
|
30 cu/yd container unit price $232.00/trip |
30 cu/yd container unit price $237.00/trip |
30 cu/yd container unit price $242.00/trip |
|||
|
KOHLER WASTE SERVICES |
|
$22,410.00/yr |
$22,410.00/yr |
$22,410.00/yr |
|
|
30 cu/yd container unit price No
Bid |
30 cu/yd container unit price No
Bid |
30 cu/yd container unit price No
Bid |
|||
|
RUBINETTI DISPOSAL |
|
$25,512.00/yr |
$25,992.00/yr |
$26,700.00/yr |
|
|
30 cu/yd container unit price $225.00/trip |
30 cu/yd container unit price $225.00/trip |
30 cu/yd container unit price $225.00/trip |
|||
|
Bidder |
|
ALT 1 cost per month Sept - April (2012-2013) |
ALT 1 cost per month Sept-April (2013-2014) |
ALT 1 cost per month Sept- April (2014-2015) |
|
WASTE MANAGEMENT |
|
$237.00 |
$242.00 |
$247.00 |
|
KOHLER WASTE MANAGEMENT |
|
$103.00 |
$103.00 |
$103.00 |
|
RUBINETTI DISPOSAL |
|
$125.00 |
$130.00 |
$135.00 |
BTSA BID #2012-03 ALUM BUILDING
WEDNESDAY, AUGUST 1, 2012 AT 10:30 AM
|
BIDDER NAME |
UNIT PRICE |
ALLOWANCE “A” UNFORSEEN CONTINGENCIES |
ALLOWANCE “B” MINOR STRUCTURAL/ ARCHITECTURAL MODIFICATIONS |
ALLOWANCE “C” SCADA INTEGRATION |
ALTERNATE “A” |
T.R. WENIGER
|
$239,500.00 |
$10,000.00 |
$5,000.00 |
$10,000.00 |
$34,000.00 |
JEV CONSTRUCTION
|
$259,500.00 |
$10,000.00 |
$5,000.00 |
$10,000.00 |
$33,000.00 |
RAY PALMER ASSOCIATES
|
$304,550.00 |
$10,000.00 |
$5,000.00 |
$10,000.00 |
$22,400.00 |
CFM CONSTRUCTION
|
$288,500.00 |
$10,000.00 |
$5,000.00 |
$10,000.00 |
$30,250.00 |
IRON HILLS CONST.
|
$344,151.00 |
$10,000.00 |
$5,000.00 |
$10,000.00 |
$34,259.00 |
BTSA
BID #2012-05
BULK
LIQUID ALUMINUM SULFATE
WEDNESDAY, JULY
25, 2012 AT 10:30 AM
|
BIDDER NAME |
BID AMOUNT PER GALLON |
THATCHER CO. OF NY
|
$.8742 |
GENERAL CHEMICAL
|
$.9639 |
USALCO
|
$1.06 |
BID #2012-10 – MUNICIPAL ELECTRICAL SERVICES
WEDNESDAY JULY 11, 2012 AT 10:30
A.M.
|
BIDDER NAME |
HOURLY RATE |
OT RATE |
DISCOUNT |
|
APEX AMERICAN |
$74.00 |
$106.00 |
30% |
|
ASM ELECTRIC |
$77.25 |
$115.88 |
10% |
BID #2012-11 MUNICIPAL HVAC SERVICES
WEDNESDAY, JULY 11 AT 10:30
A.M.
|
BIDDER NAME |
DPW/YR |
LIBRARY/YR |
MUNICIPAL BLDG/YR |
POLICE DEPT/YR |
HOURLY RATE |
OT RATE |
DISCOUNT |
|
ABLE
MECHANICAL |
$740.00 |
$2,820.00 |
$2,160.00 |
$864.00 |
$87.00 |
$130.00 |
35% |
|
BINSKY SERVICES |
$1,820.00 |
$2,072.00 |
$3,640.00 |
$1,456.00 |
$91.00 |
$136.00 |
10% |
|
CORE MECHANICAL |
$2,480.00 |
$5,580.00 |
$6,000.00 |
$2,400.00 |
$72.99 |
$110.00 |
10% |
|
AIR SYSTEMS MAINT. |
$3,585.00 |
$6,274.00 |
$4,733.00 |
$3,557.00 |
$98.00 |
$147.00 |
10% |
|
TM BRENNAN |
$14,400.00 |
$28,800.00 |
$25,600.00 |
$11,200.00 |
$100.00 |
$150.00 |
12.5% |
#2012-01 RE-BID
DUNHAM PARK HOCKEY
RINK RECONSTRUCTION
BIDS RECEIVED WEDNESDAY, JULY 11, 2012 AT 11:00 AM
|
BIDDER NAME |
BASE BID |
ALTERNATE |
|
HALECON,
INC. |
$98,850.00 |
$14,600.00 |
BTSA BID
#2012-02 RE-BID
SOUTH MAPLE
AVENUE PUMP STATION REHABILITATION
WEDNESDAY, JUNE 27, 2012 AT 10:30
AM
|
BIDDER NAME |
ITEM SC1.00 LUMP SUM BID |
ITEM SC2.00 ALLOWANCE SC2 |
ITEM SC3.00 ALLOWANCE SC3 |
ITEM SC4.OO ALLOWANCE SC4 |
ITEM SC5.00 ALLOWANCE SC5 |
ITEMSC6.00 ALLOWANCE SC6 |
ITEM SC7.00 ROCK EXCAVATION |
TOTAL BASE BID |
DE MAIO ELECTRIC
|
$1,058,500.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$2,500.00 |
$1,142,000.00 |
BEAVER ELECTRIC
|
$1,105,000.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$2,500.00 |
$1,188,500.00 |
ALLIED CONST.
|
$1,244,500.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$2,500.00 |
$1,328,000.00 |
COPPOLA SVCS.
|
$1,287,890.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$2,500.00 |
$1,371,390.00 |
FERRARO CONST.
|
$1,387,899.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$9,250.00 |
$1,478,149.00 |
BID #2012-09
PARKS AND
RECREATION COURT REPAIRS
TUESDAY, JUNE 19, 2012 AT 2:00 PM
|
BIDDER NAME |
BASE BID |
ALTERNATE ITEMS |
Tillerman
|
$ 81,650.00 |
$ 57,489.00 |
Halecon
|
$122,100.00 |
$ 59,520.00 |
Di Milia
|
$102,600.00 |
$ 77,800.00 |
BID #2012-08
COLLYER LANE
IMPROVEMENTS
WEDNESDAY, JUNE 13, 2012 AT 10:30 AM
|
BIDDER NAME |
TOTAL BID AMOUNT |
MIDWEST CONSTRUCTION
|
$196,450.75 |
TILCON NY, INC.
|
$213,356.88 |
JADS CONSTRUCTION
|
$214,284.75 |
CIFELLI AND SON
|
$228,423.25 |
LAKESIDE CONSTRUCTION
|
$231,121.50 |
TOPLINE CONSTRUCTION
|
$249,051.86 |
BID BTSA
#2012-04
LAGOON VALVE
CHAMBER
WEDNESDAY, MAY 30, 2012 AT 10:30 AM
|
BIDDER NAME |
TOTAL BID AMOUNT |
|
ALLIED CONSTRUCTION |
$208,900.00 |
|
COPPOLA SERVICES |
$309,500.00 |
|
A & J CONSTRUCTION |
$331,470.00 |
|
ROCK SOLID CONSTRUCTION |
$436,000.00 |
|
FERRARO CONSTRUCTION |
$473,380.00 |
BID #2012-06
ROAD
IMPROVEMENTS
WEDNESDAY, MAY 23, 2012 AT 10:30 AM
|
BIDDER NAME |
TOTAL BID AMOUNT |
TILCON NY, INC.
|
$1,220,444.00 |
MECO, INC.
|
$1,239,019.72 |
MARK PAVING
|
$1,383,260.40 |
DLS CONTRACTING
|
$1,456,937.50 |
ENGLISH PAVING CO.
|
$1,486,806.00 |
TOP LINE CONSTRUCTION
|
$1,487,219.70 |
BLACK ROCK ENTERPRISE
|
$1,494,433.50 |
STAVOLA CONTRACTING
|
$1,644,559.80 |
BID #2012-07
PVP TENNIS
COURTS
WEDNESDAY, MAY 23, 2012 AT 10:45 AM
|
BIDDER NAME |
TOTAL BID AMOUNT |
BRENNAN BROS.
|
$176,282.40 |
TILLERMAN
LANDSCAPING
|
$179,179.00 |
#2012-03
CEDAR HILL AND WILLIAM ANNIN SCHOOLS
DRAINAGE
IMPROVEMENTS
BIDS RECEIVED TUESDAY, MAY 1, 2012 AT
2:00 PM
|
BIDDER NAME |
BASE BID |
|
CMS CONSTRUCTION |
$70,710.00 |
|
JADS CONSTRUCTION |
$74,779.00 |
|
LIBERTY CONSTRUCTION & DEV |
$74,865.00 |
|
JOHN GARCIA CONSTRUCTION CO. |
$76,720.00 |
|
A.J.S. ASSOCIATES, INC |
$78,024.00 |
|
DIAMOND CONSTRUCTION |
$78,415.00 |
|
REIVAX CONTRACTING CORP. |
$93,130.00 |
|
KALOGRIDIS CONTRACTING |
$97,446.00 |
|
BRENNAN BROS. |
$103,808.90 |
|
T. FIOTAKIS CONSTRUCTION |
$109,105.00 |
|
L T I INC. |
$112,790.00 |
|
V & K CONSTRUCTION |
$123,131.00 |
|
F & P CONTRACTORS |
$125,175.00 |
|
DRILL CONSTRUCTION |
$129,238.00 |
|
TILLERMAN LANDSCAPING |
$129,825.00 |
|
HILLCREST PAVING & EXCAVATING |
$156,560.00 |
#2012-04
LIBERTY CORNER SCHOOL
SITE
IMPROVEMENTS
BIDS RECEIVED TUESDAY, MAY 1, 2012 AT
2:15 PM
|
BIDDER NAME |
BASE BID |
|
JADS CONSTRUCTION |
$199,360.00 |
|
A & A CURBING, INC. |
$233,975.00 |
|
BRENNAN BROS. |
$264,878.50 |
|
A-TECH, INC. |
$278,835.00 |
|
BERTO CONSTRUCTION |
$280,405.00 |
|
V & K CONSTRUCTION |
$283,580.00 |
|
CMS CONSTRUCTION |
$290,890.00 |
|
DRILL CONSTRUCTION |
$301,233.00 |
|
T. FIOTAKIS CONSTRUCTION |
$358,100.00 |
|
HILLCREST PAVING & EXCAV. |
$358,358.00 |
|
F & P CONTRACTORS |
$364,875.00 |
|
TEC-CON CONTRACTORS |
$445,856.50 |
|
PETILLO, INC. |
$510,170.00 |
|
DIAMOND CONSTRUCTION |
$533,845.00 |
BID #2012-05 DEPARTMENT OF PUBLIC
WORKS
ROAD IMPROVEMENTS
TUESDAY, MAY 1, 2012 AT 2:45PM
|
BIDDER NAME |
TOTAL BID AMOUNT |
ALT. #2 |
RENDA ROADS
|
$248,975.00 |
$789.00 |
JADS CONSTRUCTION
|
$268,640.00 |
$4,100.00 |
SCHIFANO CONSTRUCTION
|
$638,856.25 |
$1,078.00 |
BID #2012-02 2012 158” WHEELBASE FORD E SERIES
SUPER
DUTY (CUTAWAY CHASSIS) AMBULANCE
FRIDAY, APRIL 27, 2012 AT 10:30
A.M.
|
BIDDER NAME |
UNIT COST 2012 158” WHEELBASE FORD E SERIES
SUPER DUTY AMBULANCE |
UNIT COST LESS TRADE-IN 2001 FORD E SERIES AMBULANCE W/ 57874
MILES |
NET DELIVERED LUMP SUM BID |
BAY HEAD INVESTMENTS
|
$ 169,769.00 |
$ 9,500.00 |
$ 160,269.00 |
#2012-01 RE-BID
DUNHAM PARK HOCKEY RINK RECONSTRUCTION
BIDS RECEIVED WEDNESDAY, APRIL 25, 2012 AT 10:30 AM
|
BIDDER NAME |
BASE BID |
|
ASAP
INC. |
$190,070.60 |
|
HALECON,
INC. |
$214,760.00 |
|
CCM
CONTRACTING |
$216,570.00 |
|
TILLERMAN
LANDSCAPING |
$220,220.00 |
BTSA BID
#2012-02
SOUTH MAPLE
AVENUE PUMP STATION REHABILITATION
WEDNESDAY, APRIL 11, 2012 AT 10:30
AM
|
BIDDER NAME |
ITEM SC1.00 LUMP SUM BID |
ITEM SC2.00 ALLOWANCE SC2 |
ITEM SC3.00 ALLOWANCE SC3 |
ITEM SC4.OO ALLOWANCE SC4 |
ITEM SC5.00 ALLOWANCE SC5 |
ITEMSC6.00 ALLOWANCE SC6 |
TOTAL BASE BID |
DeMAIO ELECTRIC
|
$ 1,126,000.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$1,207,000.00 |
BEAVER ELECTRIC
|
$1,150,000.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$1,231,000.00 |
ALLIED CONSTRUCTION
|
$1,278,000.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$1,359,000.00 |
COPPOLA SERVICES
|
$ 1,388,000.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$1,469,000.00 |
T&T
COMMENWEALTH
|
$1,656,420.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$1,737,420.00 |
FERRARO CONSTRUCTION
|
$2,589,384.00 |
$15,000 |
$10,000 |
$10,000 |
$6,000 |
$40,000 |
$2,670,384.00 |
BID #
2012-01 CONCESSION LEASE AT
PLEASANT
VALLEY POOL
BIDS RECEIVED WEDNESDAY, FEBRUARY 22,
2012
AT 10:30 AM
|
BIDDER NAME |
2012 AMOUNT |
2013 AMOUNT |
2014 AMOUNT |
LKE CATERING INC
|
$
5101.00 |
$ 5101.00 |
$ 5101.00 |
REMOVAL/DISPOSAL
OF DEWATERED SLUDGE
Wednesday,
January 18, 2012 AT 10:30 AM
|
BIDDER NAME |
PRICE PER CUBIC YARD |
SOLID WASTE SERVICES
|
$78.50 |
SPECTRASERV
|
$83.00 |
ACCURATE WASTE SYSTEMS
|
$84.00 |